Project documentation

Confidence begins
with the details.

Agree the building specification and the evidence your local project team needs before production.

The building

Define the supplied scope

Layout, dimensions, structure, materials, finishes and equipment belong in the signed drawing and quotation.

The setting

Review local conditions

Foundation, anchoring, wind, thermal performance, fire requirements and service connections depend on the intended use and site.

The assessment

Coordinate the evidence

Discuss structural calculations, material information and product certificates with the qualified local team responsible for approval.

The handover

Prepare for installation

Confirm delivery access, lifting resources, connection points and installation responsibilities in advance.

Australian projects

A local pathway
to approval.

Prefabricated buildings must be assessed against the applicable National Construction Code requirements and state or territory rules. Product certificates support that assessment; the site and completed building still need the appropriate approval.

Bring your local designer, engineer or certifier into the specification discussion early. We coordinate the building information needed for their review.

Structure & foundations

Confirm design actions, fixing details and support reactions with the building and foundation designers.

Envelope & comfort

Review insulation, glazing, weatherproofing and the proposed heating and ventilation systems.

Electrical & plumbing

Agree suitable equipment and service interfaces, then arrange the required local installation and connection work.

Plan the bathroom
as carefully as the room.

For Australian projects, products within the WaterMark certification scheme need the appropriate certification. Review the selected plumbing and drainage products against the current schedule and product database.

A dry-shell option can leave agreed fittings for installation by your local licensed team. Factory fit-out is also possible where the specified products and documentation meet the project requirements.

The fit-out approach should be agreed with your local plumber and certifier before the order.

Official reference

Use the ABCB product information to check what applies to the proposed installation.

WaterMark product information ↗

For the wider building assessment:

Australian Building Codes Board ↗

Certificates & inspection.

Our manufacturing partners hold the applicable credentials. Request the relevant certificate copies and scope with your quotation.

CE marking

Where the destination market requires CE marking for the components we supply. electrical items, glazing and fixings. the manufacturer's Declaration of Conformity and EU authorised representative details are provided with the quotation.

ISO 9001

Quality management system at the manufacturing facility. certificate copies and issuing-body details supplied with every quotation.

ISO 14001

Environmental management system at the manufacturing facility. certificate copies and issuing-body details supplied with every quotation.

SGS inspection

Third-party pre-shipment inspection, available on request.

A documented delivery.

Documentation scope is agreed for the order and destination.
Production drawingsModel dimensions, layout, openings, connections and selected details.
Material & equipment scheduleFinishes, panel build-up, glazing, sanitaryware and equipment included in the order.
Commercial invoice & packing listOrder and item details for shipping and customs.
Bill of lading & origin documentsCargo documentation and origin evidence where applicable.
Installation guidanceThe agreed model assembly information and maintenance guidance.
Inspection recordsProduction and pre-shipment inspection records as agreed.

Start with the site and intended use.

Send the location and your local team's requirements. We will help define the building information needed.